Warranty: | 1 Year | After-sale Service: | Online Technical Support, Onsite Installation, Onsite Training, Onsite Inspection |
---|---|---|---|
Weight: | 7.5g / Cm3 | Chemical Composition: | Q195 / 6.5 High Wire Coil Cold Drawn Wire |
Alloy Or Not: | Is Alloy | Secondary Or Not: | Non-secondary |
Project Solution Capability: | Graphic Design, Total Solution For Projects, Others | Application: | Hotel, Villa, Apartment, Office Building, Warehouse, Workshop, Farmhouse, Courtyard, Road/bridge/tunnel |
Product Name: | Steel Fibre | Diameter: | 0.5-0.7mm |
Length: | 30/35/40/45/55 | Color: | Silver White |
Shape: | Hooked Ends | Package: | 25kg/bag |
Port: | Cuntan /Shenzhen |
For Concrete The Steel Material End Hook Type Concrete Reinforcement Steel Fiber
Technical requirements for ground construction of steel fiber reinforced concrete industrial buildings
General engineering mix
Steel fiber content (%) |
sand ratio (%) |
water cement ratio
|
Collapsbillity (cm) |
dosage per unit (Kg/cubic) |
||||
steel fibre |
concrete |
gravel |
sand |
water |
||||
1-1.2 |
40 |
0.45 |
3-5 |
78 |
450 |
1233 |
819 |
180 |
Crucial engineering mix
Steel fiber content (%) |
sand ratio (%) |
water cement ratio
|
Collapsbillity (cm) |
dosage per unit (Kg/cubic) |
||||
steel fibre |
concrete |
gravel |
sand |
water |
||||
1.5-1.8 |
46 |
0.45 |
3-5 |
120 |
450 |
1210 |
1035 |
200 |
2019 n
ew
product chopped fiber price Concrete Reinforcement continuous roving basalt fiber